Abstract:
This transcript details a project update meeting hosted by the Open Research Institute (ORI) regarding the Deep Space Exploration Society’s (DSES) participation in the NASA Artemis 2 Tracking Challenge. The discussion centers on the technical and logistical preparations required for tracking the Artemis 2 crewed capsule to the moon. Key topics include the resolution of critical hardware failures (specifically frequency standards), the validation of the Haswell ground station dish for high-frequency operations (up to 8.5 GHz), and the operational challenges of maintaining 24/7 staffing at a remote site for a 10-day mission window. The meeting also outlines how these efforts serve as a precursor to upcoming Earth-Venus-Earth (EVE) communication experiments and the eventual tracking of the asteroid Apophis.
Mission Update & Technical Summary:
0:35 – Meeting Objective: ORI projects update for January 27, 2026, focusing on progress, resources, and roadblocks for the DSES Artemis 2 tracking initiative.
1:14 – NASA Coordination & Data Packaging: DSES is part of a 35-participant worldwide group. Key unknowns involve specific steering data, scheduling, and data bundling protocols (frequency and format of telemetry/tracking results).
2:27 – Artemis 2 Challenge Overview: The project involves providing NASA with independent tracking data for the crewed capsule during its lunar transit.
4:59 – Critical Hardware Failure: The donated HP 565A master clock is non-functional and unrepairable before the mission. Mitigation requires either a temporary loan of an HP Cesium oscillator or pulling a commercial unit from active production.
6:22 – RF Package Testing: Final RF packages (main and backup) are being tested at the Haswell site. Simultaneous measurements from independent hardware are planned to ensure data redundancy.
7:04 – Antenna Steering Requirements: Higher operational frequencies (2.2 GHz) result in a narrower beam width (less than 0.5°). This necessitates higher steering precision and a dedicated three-person "System 1" steering team.
7:57 – Staffing Logistics: The 10-day mission requires a minimum of two personnel on-site at all times for safety and manual steering oversight, as remote steering is prohibited for this mission.
9:20 – Trajectory Constraints: Discussion of Trans-Lunar Injection (TLI) points. If burns occur over the South Pacific, the capsule may be below the horizon for DSES and other Northern Hemisphere stations.
11:14 – Data Limitations: Participants are tracking the mission, not decoding telemetry, as the primary data stream is encrypted.
12:44 – Dish Performance Validation: Recent tests at 8.5 GHz (X-band) confirmed the 1950s-era dish exceeds its original design specifications, maintaining performance accuracy to 0.1° and validating its utility for upcoming 2.4 GHz EVE experiments.
17:21 – Earth-Venus-Earth (EVE) Planning: Scheduled for October 2026. Challenges include high path loss, the requirement for long integration times, and the proximity of Venus to the Sun (thermal/RFI risk).
19:32 – Transmitter Design: The EVE project aims for a 1.5 kW output by combining five 250W transmitters to avoid pushing individual components to their thermal limits.
22:54 – Operations & Site Support: Comparison of the Haswell site to the Allen Telescope Array (ATA). Haswell provides RV hookups and basic dormitory facilities, which are essential for multi-day "dry camping" mission profiles.
30:13 – RFI Environment: Discussion of the Radio Frequency Interference (RFI) challenges in suburban settings (San Diego) versus the radio-quiet environment of Haswell, specifically regarding hydrogen line (21 cm) observations.