Abstract

This technical debrief covers Phase 2 of the "Timber Borders" colony expansion, primarily focusing on the commencement of the "Mega Dam" project and the optimization of the regional power grid. The project lead transitions from wood-intensive construction (levies) to metal-based components (impermeable floors) to mitigate log shortages. Key infrastructure developments include the implementation of a dual-point zipline logistics network to bypass inefficient pedestrian paths and the excavation of a subsurface power transmission tunnel. The session also details the scaling of metal production through a centralized smelter hub to meet the high demand for advanced "Well-being" structures and the upcoming triple floodgate system.


Infrastructure & Logistics Summary