Abstract:
The Open Research Institute (ORI) Projects Meetup for March 31, 2026, details progress across four primary technical domains: OpenCPI framework deployment, the Opulent Voice digital radio protocol, satellite transponder interference cancellation (MDTSIC), and Earth-Venus-Earth (EVE) link analysis. Key milestones include the resolution of a critical VHDL bit-alignment bug in the Opulent Voice firmware that significantly increased SDR output power, and a 2026 EVE link budget revision that improved projected carrier-to-noise ratios by 8dB. The session also features high-altitude rocket telemetry analysis regarding atmospheric arcing and technical preparations for the upcoming BSides San Diego RF Village and the 2027 Fun Cube Plus mission.
Delivery of SD card images for ZC102, ZC706, and Libra SDR platforms completed.
Current focus is on data interface validation; test applications are passing at an 80% success rate, prompting investigation into sample rate inconsistencies.
Future iterations will include integrated receive/transmit images and Fast Fourier Transform (FFT) downlink capabilities.
Bit-Alignment Bug Fix: A critical firmware error was identified where 12-bit DAC data was mapped to the Least Significant Bits (LSB) instead of the Most Significant Bits (MSB) of the 16-bit data path. Correcting this alignment, alongside a new programmable shift register, restored approximately 24dB of missing output power.
Link Milestone: Successful one-way over-the-air voice link achieved between two residential stations using the corrected firmware.
Amplifier Analysis: Evaluation of low-cost Chinese power amplifier modules revealed high failure rates in idle states. Conversely, a 13W module demonstrated high reliability and 100% duty cycle performance during high-altitude testing.
Review of sounding rocket data (Wallops and Norway launches) reaching 160km altitudes.
Technical Takeaway: Systems must account for breakdown voltage and arcing in rarified atmospheres (Paschen's Law). Recommendations include internal nitrogen pressurization or extensive polymer conformal coating to prevent plasma ionizing arcs during ascent.
The mission launch is rescheduled for 2027, providing additional development time for successive interference cancellation (SIC) algorithms.
Current roadblock: SPI timing errors between the FPGA (Lattice ICE40) and the STM processor are resulting in data rotation and "nonsense" byte clocking.
Resource Need: The project requires a specialized PCB designer capable of creating hardware that meets the strict 0.5W power envelope and LEO environmental standards.
Budget Revision: A sign error in the Python-based link analysis was corrected, resulting in an 8dB improvement in the projected carrier-to-noise ratio.
Refined Modeling: Analysis now includes dynamic radar albedo based on Venusian longitude and reflectivity maps (JPL/NASA Horizons API).
Operational Strategy: Plans are shifting from a 13-hour correlation requirement to less than one minute using "Zadchu" signals. ORI will apply for Director’s Discretionary Time on the 100-meter Green Bank Telescope for the October 2026 conjunction.
BSides San Diego (April 4, 2026): ORI will host an RF Village featuring an ISRO-inspired radar altimeter "Capture The Flag" (CTF) and RF Bitbanger kit sales.
Friedrichshafen (June 2026): Technical meetup planned with AMSAT-UK and AMSAT-DL to coordinate future GEO workshops and transponder integration.
Phase 3: Reviewer Recommendations
Target Review Group:Deep Space Communications & SDR Systems Integration Peer Review Panel.
Expert Summary (The "Reviewer's Perspective"):
The ORI engineering team has demonstrated successful troubleshooting of the physical-to-digital layer interface, specifically the VHDL mapping issue that previously bottlenecked signal propagation. The transition from monostatic to bi-static link modeling for the 2026 Venus attempt represents a significant increase in architectural maturity. However, the recurring SPI timing latency in the MDTSIC project indicates a need for more rigorous hardware-in-the-loop (HIL) testing. The panel should prioritize validating the EVE link budget assumptions—specifically group delay and temporal spread—before committing to the Green Bank Telescope observation window. Integration of machine learning for real-time telemetry analysis, as proposed by the sounding rocket team, is a high-value secondary objective.