Abstract:
The April 14, 2026, Open Research Institute (ORI) Projects Meetup convened to review technical progress across several high-complexity communications and engineering initiatives. Key discussions centered on the "Opulent Voice" FPGA implementation, focusing on achieving interoperability between Libra and Pluto SDR platforms and resolving Costas loop instabilities following transmitter power adjustments. The "Venus-Earth-Venus" (EVE) project reported successful link budget validation against empirical 2025 radar data and outlined pending telescope time applications at Greenbank and Effelsburg. Additionally, the institute announced "Project Arcanum," a new open-source antenna modeling tool utilizing Rust for high-performance Method of Moments (MoM) calculations and Python for visualization. Finally, the meeting addressed hardware reliability and operational lessons learned from recent Artemis tracking missions and the transition toward a decentralized radio astronomy training model.
Project Status and Technical Findings:
0:00:36 — Opulent Voice Implementation: Development of the "Charlie" implementation continues with a focus on interoperability. The team successfully demonstrated an OpenCPI-based modulator on a Libra SDR transmitting to a C++ receiver on a Pluto SDR.
0:01:16 — Design Pivot: To ensure compatibility across all three implementations, the developer paused work on "half-sine" pulse shaping in favor of the standard rectangular implementation.
0:03:09 — Simulation vs. Hardware Testing: Simulations using captures from Pluto SDR confirmed successful frame and clock synchronization at a sample rate of 156.25 kHz. However, the simulation takes 30–40 minutes for 10 frames, highlighting the need for hardware acceleration.
0:06:41 — Synchronization Tuning: The current acquisition requires approximately 2.5 frames to lock. The clock sync operates at 2.88 samples per symbol; refinements are needed to match the Pluto MSK implementation's performance.
0:09:22 — Toolchain Dependencies: Project builds are strictly dependent on Vivado 2022.2 due to specific Analog Devices HDL reference design requirements and LibIIO specifications.
0:11:32 — "The Case of the Missing 24 dB": Following a 24 dB increase in transmit power, the receiver loop required re-tuning. The increased power caused the Costas loop's proportional and integral (PI) gains to become "too hot," leading to bit-slips.
0:13:38 — Clock Recovery Debugging: Visual waveform analysis initially failed to detect a rubber-banding effect in the clock recovery pulse. Detailed simulation revealed that the timing loop was oscillating enough to "swallow" bits, necessitating a gain adjustment to achieve lock within a few bits.
0:16:13 — Venus-Earth-Venus (EVE) Validation: Link analysis was validated within 1 dB of recorded 2025 radar data. The project is now applying for observation time at Greenbank (100m) and Effelsburg (100m) for the October 2026 inferior conjunction.
0:21:29 — EVE Communications Protocol: A specialized digital protocol is being designed to handle extreme Doppler spread and low coherence times (0.1 to 1 bit per second). Unlike terrestrial protocols, this design does not assume infinite coherence time.
0:24:42 — Project Arcanum Launch: A new open-source antenna analysis project was announced to provide a Method of Moments (MoM) alternative to the segment-based NEC-2. It specifically targets curved and helical wire antennas.
0:27:01 — Arcanum Technical Stack: The project utilizes Rust for matrix operations (LU decomposition) and Python/Jupyter for parsing and visualization. Development follows a strict four-phase math-to-code validation process.
0:33:55 — Hardware Visualization Challenges: Discrepancies between perfect simulations and failing hardware were discussed. Developers will use Integrated Logic Analyzers (ILA) to probe internal hardware signals, though BRAM limitations on the FPGA constrain the capture window.
0:42:53 — Artemis Tracking Review: A 28-page final report on Artemis tracking was published. It detailed an automated steering system that interrogates JPL Horizons but noted hardware failures in the azimuth motor halfway through the mission.
0:47:14 — Operational Redundancy: Following the azimuth motor failure, volunteers manually steered the dish for 16 hours across two shifts by keeping a target centered in a software-generated UI.
0:58:48 — Radio Astronomy Training Initiative: ORI is launching a program to train volunteers in pulsar and magnetar tracking, data folding, and noise correlation. The goal is to move from a single-expert dependency to a decentralized team capable of remote observation sessions.