Abstract:

This video documents the construction of a 2.5-meter tall, natural-draft shaft furnace using primitive techniques and materials. The process begins with digging a pit and preparing a reinforced clay mixture using soil, banana fiber, and crushed brick grog to prevent cracking. The furnace is built in stages, incorporating four angled tuyeres (air pipes), a lower doorway, and an upper charging door. The structure narrows into a "bottle neck" chimney, which is built using pre-stiffened clay rings to accelerate construction. The video then details the production of charcoal fuel using a mound with a central log-cabin style chimney for ignition. Finally, it shows the smelting attempt using ore derived from dried iron bacteria. The furnace is preheated, charged with charcoal and ore in a specific ratio for 20 cycles, but the smelt ultimately fails, producing only slag with no discernible iron.

Building a 2.5m Tall Shaft Furnace and Attempting an Iron Smelt

Summary Rating: No ratings yet
Article Rating: No ratings yet

Source